Full Section (Mile Post 2100-2140)
2101.1544 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2101.1569 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2101.1874 | Integrity Dig re: DENT | 2014-05-02 |
2101.6175 | Integrity Dig re: CRACK | 2014-05-02 |
2101.9318 | Integrity Dig re: CRACK | 2014-05-27 |
2102.8499 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2103.0079 | Integrity Dig re: CRACK | 2014-05-02 |
2103.4904 | Integrity Dig re: CRACK | 2014-03-12 |
2103.5130 | Integrity Dig re: CRACK | 2014-03-12 |
2104.1277 | Integrity Dig re: CRACK | 2014-04-07 |
2104.1277 | Integrity Dig re: CRACK | 2014-05-05 |
2104.3406 | Integrity Dig re: CRACK | 2013-07-17 |
2104.3771 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
Mile Post 2105-2110
2105.1550 | Integrity Dig re: CRACK | 2014-05-23 |
2105.3684 | Integrity Dig re: CRACK | 2014-05-23 |
2105.4507 | Integrity Dig re: CRACK | 2014-05-23 |
2105.5971 | Integrity Dig re: CRACK | 2011-05-30 |
2105.8331 | Integrity Dig re: CRACK | 2014-04-23 |
2105.8340 | Integrity Dig re: CORROSION | 2011-05-30 |
2105.9311 | Integrity Dig re: CRACK | 2013-12-23 |
2105.9463 | Integrity Dig re: CRACK | 2014-05-23 |
2105.9842 | Integrity Dig re: CRACK | 2014-05-30 |
2106.0223 | Integrity Dig re: CRACK | 2014-04-23 |
2106.0293 | Integrity Dig re: CRACK | 2014-04-23 |
2106.0446 | Integrity Dig re: CRACK | 2014-06-03 |
2106.0583 | Integrity Dig re: CRACK | 2014-04-23 |
2106.3278 | Integrity Dig re: CRACK | 2014-04-03 |
2106.3476 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2106.3873 | Integrity Dig re: CRACK | 2014-04-03 |
2106.4800 | Installation of New Remote Sectionalizing Valve | 2014-06-18 |
2106.5374 | Integrity Dig re: CORROSION | 2007-05-18 |
2106.6888 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2106.7029 | Integrity Dig re: CRACK | 2014-03-10 |
2106.7103 | Integrity Dig re: CRACK | 2013-06-27 |
2106.7504 | Integrity Dig re: CRACK | 2014-04-03 |
2106.9863 | Integrity Dig re: CRACK | 2014-06-23 |
2107.1068 | Integrity Dig re: CRACK | 2014-05-29 |
2107.3595 | Integrity Dig re: CRACK | 2014-05-13 |
2107.6725 | Integrity Dig re: CRACK | 2013-09-26 |
2109.4202 | Integrity Dig re: CRACK | 2014-04-28 |
2109.6140 | Integrity Dig re: CRACK | 2014-05-23 |
2109.8468 | Integrity Dig re: CRACK | 2014-05-02 |
2109.9360 | Present anode bed is 13 yrs old and must be replaced to keep cathodic protection levels at acceptable level (NACE Guidelines) | 2006-05-08 |
Mile Post 2110-2115
2110.0718 | Integrity Dig re: CRACK | 2014-06-19 |
2110.0793 | Integrity Dig re: CRACK | 2014-04-03 |
2110.0868 | Integrity Dig re: CRACK | 2014-04-08 |
2110.0944 | Integrity Dig re: CRACK | 2014-04-03 |
2110.2593 | Integrity Dig re: CRACK | 2014-04-03 |
2110.5325 | Integrity Dig re: CRACK | 2014-05-02 |
2111.1985 | Integrity Dig re: CRACK | 2014-05-06 |
2111.9865 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2112.7221 | Integrity Dig re: DENT | 2014-04-02 |
2113.1760 | Integrity Dig re: CRACK | 2014-05-13 |
2113.8124 | Integrity Dig re: CRACK | 2014-06-02 |
2113.9967 | Integrity Dig re: CRACK | 2014-05-12 |
2114.9240 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
Mile Post 2115-2120
2115.1364 | Integrity Dig re: CRACK | 2014-05-02 |
2117.3107 | Integrity Dig re: CRACK | 2014-04-01 |
2117.3302 | Integrity Dig re: CRACK | 2014-04-01 |
2117.3377 | Integrity Dig re: CRACK | 2014-04-01 |
2117.3527 | Integrity Dig re: CRACK | 2014-04-24 |
2117.5539 | Integrity Dig re: CRACK | 2014-06-03 |
2117.5687 | Integrity Dig re: CRACK | 2014-06-13 |
2117.5844 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2118.1128 | Integrity Dig re: CRACK | 2014-06-16 |
2118.2974 | Integrity Dig re: CRACK | 2014-05-02 |
2118.6133 | Integrity Dig re: CRACK | 2013-07-05 |
2118.6282 | Integrity Dig re: CRACK | 2013-07-05 |
2118.9661 | Integrity Dig re: CRACK | 2014-06-05 |
2119.3226 | Integrity Dig re: CRACK | 2014-03-12 |
2119.3467 | Integrity Dig re: CRACK | 2013-07-08 |
2119.3543 | Integrity Dig re: CRACK | 2014-05-06 |
2119.9000 | Integrity Dig re: CRACK | 2014-03-28 |
Mile Post 2120-2125
2120.2756 | Integrity Dig re: CRACK | 2014-05-23 |
2120.2831 | Integrity Dig re: CRACK | 2014-05-13 |
2120.2907 | Integrity Dig re: CRACK | 2014-05-06 |
2120.3056 | Integrity Dig re: CRACK | 2014-05-13 |
2120.4500 | Integrity Dig re: CRACK | 2014-05-13 |
2121.4439 | Integrity Dig re: CRACK | 2014-05-16 |
2121.6947 | Integrity Dig re: CRACK | 2014-04-02 |
2121.7022 | Integrity Dig re: CRACK | 2014-04-02 |
2121.7546 | Integrity Dig re: DENT | 2007-05-17 |
2122.1070 | Integrity Dig re: CRACK | 2014-05-21 |
2122.3090 | Integrity Dig re: CRACK | 2014-05-02 |
2122.6740 | Integrity Dig re: CRACK | 2014-05-01 |
2122.7221 | Integrity Dig re: DENT | 2014-05-01 |
2123.3547 | Integrity Dig re: CRACK | 2013-06-20 |
2124.8344 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
Mile Post 2125-2130
2125.1001 | Integrity Dig re: CRACK | 2014-05-13 |
2125.1225 | Integrity Dig re: DENT | 2013-07-25 |
2125.8849 | Integrity Dig re: CRACK | 2014-05-30 |
2126.2763 | Integrity Dig re: CRACK | 2013-08-30 |
2126.4159 | Integrity Dig re: CRACK | 2014-06-05 |
2126.4308 | Integrity Dig re: CRACK | 2014-06-04 |
2126.8057 | Integrity Dig re: CRACK | 2014-06-04 |
2126.9786 | Integrity Dig re: CRACK | 2014-06-02 |
2127.2269 | Integrity Dig re: CRACK | 2013-09-10 |
2127.7400 | Installation of concrete slabs in ditch above pipe. Insufficient Depth of Cover. | 2009-07-14 |
2127.9061 | Integrity Dig re: CRACK | 2014-04-08 |
2128.2458 | Integrity Dig re: CRACK | 2014-06-19 |
2129.2125 | Integrity Dig re: CRACK | 2009-01-13 |
2129.7613 | Integrity Dig re: CRACK | 2014-06-23 |
2129.8265 | Integrity Dig re: CRACK | 2014-05-27 |
2129.8944 | Integrity Dig re: CRACK | 2014-05-27 |
Mile Post 2130-2135
2130.1689 | Integrity Dig re: CRACK | 2013-09-04 |
2130.3035 | Integrity Dig re: DENT | 2007-12-17 |
2130.3340 | Integrity Dig re: CRACK | 2014-05-27 |
2130.3748 | Integrity Dig re: CRACK | 2014-05-27 |
2130.5520 | Integrity Dig re: CRACK | 2014-06-05 |
2130.5972 | Integrity Dig re: CRACK | 2014-05-27 |
2130.8270 | Integrity Dig re: CRACK | 2014-05-30 |
2131.0987 | Integrity Dig re: CRACK | 2014-05-01 |
2131.1895 | Integrity Dig re: CRACK | 2014-05-13 |
2131.3028 | Integrity Dig re: CRACK | 2014-05-01 |
2131.3251 | Integrity Dig re: CRACK | 2010-12-20 |
2132.0860 | Installation of concrete slabs in ditch above pipe. Insufficient Depth of Cover. | 2009-07-14 |
2132.2044 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2132.6147 | Integrity Dig re: CRACK | 2013-07-31 |
2132.9335 | Integrity Dig re: CRACK | 2013-05-15 |
2132.9411 | Integrity Dig re: CRACK | 2013-07-25 |
Mile Post 2135-2140
2135.5881 | Integrity Dig re: CRACK | 2013-06-13 |
2135.6323 | Integrity Dig re: CRACK | 2013-06-12 |
2136.7650 | Installation of concrete slabs in ditch above pipe. Insufficient Depth of Cover. | 2009-07-14 |
2137.2089 | Integrity Dig re: CRACK | 2013-07-19 |
2138.5919 | Integrity Dig re: CRACK | 2013-07-25 |
2138.6745 | Integrity Dig re: CRACK | 2013-07-19 |