Belleville to Kingston – 2020-2060

Full Section (Mile Post 2020-2060)

Belleville to Kingston - 2020-2060

Mile Post 2020-20252020-2025

2020.3300 Installation of New Remote Sectionalizing Valve 2014-06-18
2023.2171 Integrity Dig re: CRACK 2014-05-23
2024.0507 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2024.1962 Integrity Dig re: DENT 2013-11-01

Mile Post 2025-2030

2025-2030

No Maintenance Activities

Mile Post 2030-20352030-2035

2034.5800 Installation of New Remote Sectionalizing Valve 2014-04-22

Mile Post 2035-20402035-2040

2036.2330 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2037.7461 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07

Mile Post 2040-2045

2040-2045

2040.5983 Integrity Dig re: CRACK 2014-05-01

Mile Post 2045-20502045-2050

2047.1128 Integrity Dig re: DENT 2013-11-01

Mile Post 2050-2055

2050-2055

2050.3608 Excavate and install a protective barrier between pipeline and bottom of creek or ditch. Integrity protection of pipeline from contact by equipment or erosion. 2010-06-29
2052.4599 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2053.8042 Integrity Dig re: DENT 2013-09-10
2054.4988 Integrity Dig re: DENT 2013-07-15
2054.6681 Integrity Dig re: CRACK 2013-07-15

Mile Post 2055-2060

2055-2060

2055.0468 Integrity Dig re: CRACK 2014-05-23
2056.6285 Integrity Dig re: CRACK 2013-08-29
2056.9334 Integrity Dig re: DENT 2014-05-16
2057.0085 Integrity Dig re: CRACK 2014-03-03
2057.9050 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2059.3100 Integrity Dig re: Not Specified 2013-08-22
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s