Full Section (Mile Post 1860-1900)
1861.4147 | Integrity Dig re: CRACK | 2012-11-20 |
1862.6071 | Integrity Dig re: CORROSION | 2013-10-25 |
1862.9179 | Integrity Dig re: CRACK | 2014-02-14 |
1863.0378 | Integrity Dig re: CRACK | 2014-02-20 |
1863.0528 | Integrity Dig re: CORROSION | 2013-10-25 |
1863.9632 | Integrity Dig re: CRACK | 2013-12-23 |
1863.9857 | Integrity Dig re: CRACK | 2013-10-31 |
1864.9240 | Excavate, Assess and Repair | 2006-10-04 |
Mile Post 1865-1870
1865.2480 | Excavate, Assess and Repair | 2006-10-04 |
1865.3719 | Integrity Dig re: CORROSION | 2013-07-31 |
1865.5430 | Excavate, Assess and Repair | 2006-07-12 |
1865.6057 | Excavate, Assess and Repair | 2006-07-12 |
1867.3673 | Integrity Dig re: CRACK | 2013-09-16 |
1867.3975 | Integrity Dig re: CRACK | 2013-11-18 |
1867.4274 | Integrity Dig re: CRACK | 2014-02-20 |
1867.4427 | Integrity Dig re: Not Specified | 2013-09-16 |
1867.8591 | Integrity Dig re: CRACK | 2013-09-16 |
1867.8666 | Integrity Dig re: CORROSION | 2013-09-25 |
1867.8936 | Integrity Dig re: CRACK | 2013-09-16 |
1868.1104 | Excavate, Assess and Repair | 2006-07-12 |
1868.7486 | Integrity Dig re: CRACK | 2013-09-19 |
1869.0878 | Integrity Dig re: CRACK | 2013-10-29 |
1869.2761 | Integrity Dig re: CRACK | 2013-11-14 |
1869.3942 | Excavate, Assess and Repair | 2006-08-17 |
1869.5400 | Excavate, Assess and Repair | 2006-08-23 |
Mile Post 1870-1875
No Maintenance Activities
1877.5011 | Integrity Dig re: CORROSION | 2013-10-28 |
1877.8514 | Integrity Dig re: CORROSION | 2012-05-28 |
1877.8514 | Integrity Dig re: CORROSION | 2012-06-07 |
1877.8600 | Insufficient Depth of Cover. Enbridge must complete works within the creek to restore a safe level of cover and try to prevent future erosion in the creek. | 2011-08-11 |
1878.2679 | Integrity Dig re: CORROSION | 2014-04-02 |
1878.2679 | Integrity Dig re: CORROSION | 2014-05-12 |
1878.8675 | Integrity Dig re: CRACK | 2013-11-12 |
Mile Post 1880-1885
1881.5000 | Making minor adjustments to Joshua Creek, which was realigned in 2003 to prevent erosion. | 2005-10-28 |
1884.3500 | Due to erosion in a drainage ditch, Line 9 (30″) has been exposed (approx. 5 feet in length). The line will be excavated and the coating assessed. | 2010-09-24 |
Mile Post 1885-1890
1888.7200 | Excavate approx. 220 meters at an avg depth of 4 ft, remove existing coating by grit blasting, non destructive evaluation of exposed pipe, make appropriate repair if necessary, recoat pipeline, backfill excavation using sand padding and native soils, ensure proper compaction and final site cleanup/remediation prior to the Mississauga Bus Rapid Transit (BRT) installation. Work required because future access to pipeline for maintenance purposes will be limited after BRT construction is complete. | 2011-11-21 |
1889.6800 | Excavate approx. 35m at an avg depth of 10 ft, remove existing coating by grit blasting, non destructive evaluation of exposed pipe, making appropriate repair if necessary and recoating the pipeline. | 2013-05-15 |
1889.7000 | Winston Churchill Blvd. 60m of pipe to be excavated and recoated | 2013-12-16 |
Mile Post 1890-1895
1891.6371 | Integrity Dig re: CORROSION | 2014-04-30 |
1892.8577 | Integrity Dig re: DENT | 2014-05-01 |
1893.6810 | Integrity Dig re: DENT | 2014-05-23 |
1895.7200 | To minimize future need to access pipeline, Enbridge intends to expose pipeline, remove existing corrosion protection coating and apply a high integrity coating. Enbridge will confirm integrity of pipe and ensure proper compaction during backfill prior to the commencement of the Mississauga Bus Rapid Transit Project (BRT). As a result of the new BRT to be constructed along and crossing the existing Enbridge pipeline, future access to pipeline will be limited for routine maintenance. | 2010-04-15 |
1895.7400 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1895.9796 | Integrity Dig re: DENT | 2014-05-27 |
1896.0500 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1896.2100 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1896.3500 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1896.6600 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1897.3500 | Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 | 2010-04-15 |
1897.8560 | Integrity Dig re: DENT | 2014-05-01 |
1898.1021 | Integrity Dig re: DENT | 2014-05-01 |