Hamilton to Etobicoke – Mile Post 1860-1900

Full Section (Mile Post 1860-1900)

Hamilton to Etobicoke - 1860-1900

Mile Post 1860-1865
1860-1865

1861.4147 Integrity Dig re: CRACK 2012-11-20
1862.6071 Integrity Dig re: CORROSION 2013-10-25
1862.9179 Integrity Dig re: CRACK 2014-02-14
1863.0378 Integrity Dig re: CRACK 2014-02-20
1863.0528 Integrity Dig re: CORROSION 2013-10-25
1863.9632 Integrity Dig re: CRACK 2013-12-23
1863.9857 Integrity Dig re: CRACK 2013-10-31
1864.9240 Excavate, Assess and Repair 2006-10-04

Mile Post 1865-1870

1865-1870

1865.2480 Excavate, Assess and Repair 2006-10-04
1865.3719 Integrity Dig re: CORROSION  2013-07-31
1865.5430 Excavate, Assess and Repair 2006-07-12
1865.6057 Excavate, Assess and Repair 2006-07-12
1867.3673 Integrity Dig re: CRACK 2013-09-16
1867.3975 Integrity Dig re: CRACK 2013-11-18
1867.4274 Integrity Dig re: CRACK 2014-02-20
1867.4427 Integrity Dig re: Not Specified 2013-09-16
1867.8591 Integrity Dig re: CRACK 2013-09-16
1867.8666 Integrity Dig re: CORROSION 2013-09-25
1867.8936 Integrity Dig re: CRACK 2013-09-16
1868.1104 Excavate, Assess and Repair 2006-07-12
1868.7486 Integrity Dig re: CRACK 2013-09-19
1869.0878 Integrity Dig re: CRACK 2013-10-29
1869.2761 Integrity Dig re: CRACK 2013-11-14
1869.3942 Excavate, Assess and Repair 2006-08-17
1869.5400 Excavate, Assess and Repair 2006-08-23

Mile Post 1870-1875

1870-1875

No Maintenance Activities

Mile Post 1875-18801875-1880

1877.5011 Integrity Dig re: CORROSION 2013-10-28
1877.8514 Integrity Dig re: CORROSION 2012-05-28
1877.8514 Integrity Dig re: CORROSION 2012-06-07
1877.8600 Insufficient Depth of Cover. Enbridge must complete works within the creek to restore a safe level of cover and try to prevent future erosion in the creek. 2011-08-11
1878.2679 Integrity Dig re: CORROSION 2014-04-02
1878.2679 Integrity Dig re: CORROSION 2014-05-12
1878.8675 Integrity Dig re: CRACK 2013-11-12

Mile Post 1880-1885

1880-1885

1881.5000 Making minor adjustments to Joshua Creek, which was realigned in 2003 to prevent erosion. 2005-10-28
1884.3500 Due to erosion in a drainage ditch, Line 9 (30″) has been exposed (approx. 5 feet in length). The line will be excavated and the coating assessed. 2010-09-24

Mile Post 1885-1890

1885-1890

1888.7200 Excavate approx. 220 meters at an avg depth of 4 ft, remove existing coating by grit blasting, non destructive evaluation of exposed pipe, make appropriate repair if necessary, recoat pipeline, backfill excavation using sand padding and native soils, ensure proper compaction and final site cleanup/remediation prior to the Mississauga Bus Rapid Transit (BRT) installation. Work required because future access to pipeline for maintenance purposes will be limited after BRT construction is complete. 2011-11-21
1889.6800 Excavate approx. 35m at an avg depth of 10 ft, remove existing coating by grit blasting, non destructive evaluation of exposed pipe, making appropriate repair if necessary and recoating the pipeline. 2013-05-15
1889.7000 Winston Churchill Blvd. 60m of pipe to be excavated and recoated 2013-12-16

Mile Post 1890-1895

1890-1895

1891.6371 Integrity Dig re: CORROSION 2014-04-30
1892.8577 Integrity Dig re: DENT 2014-05-01
1893.6810 Integrity Dig re: DENT 2014-05-23

Mile Post 1895-19001895-1900

1895.7200 To minimize future need to access pipeline, Enbridge intends to expose pipeline, remove existing corrosion protection coating and apply a high integrity coating. Enbridge will confirm integrity of pipe and ensure proper compaction during backfill prior to the commencement of the Mississauga Bus Rapid Transit Project (BRT). As a result of the new BRT to be constructed along and crossing the existing Enbridge pipeline, future access to pipeline will be limited for routine maintenance. 2010-04-15
1895.7400 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1895.9796 Integrity Dig re: DENT 2014-05-27
1896.0500 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1896.2100 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1896.3500 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1896.6600 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1897.3500 Mississauga Bus Rapid Transit Project (BRT). See MP 1895.72 2010-04-15
1897.8560 Integrity Dig re: DENT 2014-05-01
1898.1021 Integrity Dig re: DENT 2014-05-01

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s