North York to Whitby – 1900-1940
Full Section (Mile Post 1900-1940)

Mile Post 1900-1905
1902.2232 |
Integrity Dig re: DENT |
2014-05-02 |
1902.7458 |
Integrity Dig re: CORROSION |
2014-04-30 |
1902.9612 |
Integrity Dig re: CORROSION |
2014-05-22 |
1903.7047 |
Integrity Dig re: DENT |
2014-04-30 |
Mile Post 1905-1910
1905.6834 |
Integrity Dig re: CRACK |
2007-03-14 |
1908.4153 |
Integrity Dig re: CRACK |
2014-04-30 |
1908.4829 |
Integrity Dig re: CRACK |
2014-04-30 |
1908.6107 |
Integrity Dig re: DENT |
2014-04-30 |
1908.9110 |
To prolong life of pipeline and reduce risk of potential integrity issues, Enbridge needs to excavate pipeline, remove existing coating, conduct any required repairs, recoat pipeline, backfill and ensure proper compaction prior to the Tangiers Road extension installation. As a result of new City of Toronto Tangiers Road extension to be constructed crossing existing Enbridge pipeline, future access to pipeline will be limited for routine maintenance. |
2010-05-05 |
1909.9469 |
Integrity Dig re: CORROSION |
2014-06-06 |
Mile Post 1910-1915

1910.4971 |
Integrity Dig re: CORROSION |
2014-05-27 |
1910.5763 |
Integrity Dig re: DENT |
2014-06-06 |
1914.6198 |
Integrity Dig re: DENT |
2014-04-30 |
1914.8800 |
As a result of recent soil erosion, approximately 25m to 30m of pipe on Line 9 will be excavated to the bottom using a track hoe on both the north and south sides of the line in order to relieve soil pressure and stabilize the slope. Following inspection, the pipe coating will be repaired and the pipe backfilled. |
2012-07-03 |
Mile Post 1915-1920

1918.6900 |
Excavate, Assess and Repair |
2006-09-25 |
Mile Post 1920-1925

1921.3874 |
Integrity Dig re: DENT |
2014-04-30 |
1922.0220 |
Excavate, Assess and Repair |
2006-10-04 |
1922.1587 |
Integrity Dig re: DENT |
2014-06-18 |
1922.2766 |
Integrity Dig re: DENT |
2014-04-30 |
1923.4545 |
Rouge River Depth of Cover Project – Construction of a live crib wall to stabilize and prevent further erosion. Various historical storm events, erosion of river banks and the evolving river meander allowed the banks to erode and expose the pipeline. |
2012-08-01 |
1924.9500 |
Excavate, Assess and Repair |
2006-10-04 |
1924.9680 |
Excavate, Assess and Repair |
2006-10-04 |
1925.0000 |
Line 9 crosses the Rouge River in Ontario. 3 meters of pipe in the bank has become exposed, and requires additional cover. Temporary cover will be installed, with a permanent solution to be implemented at a later date. Synthetic rock shield/concrete blanket was placed on top. |
2009-06-24 |
Mile Post 1925-1930

1925.0000 |
Line 9 crosses the Rouge River in Ontario. 3 meters of pipe in the bank has become exposed, and requires additional cover. Temporary cover will be installed, with a permanent solution to be implemented at a later date. Synthetic rock shield/concrete blanket was placed on top. |
2009-06-24 |
1925.0590 |
Excavate, Assess and Repair |
2006-10-04 |
1927.9798 |
Integrity Dig re: CORROSION |
2012-06-18 |
1928.1067 |
Integrity Dig re: DENT |
2014-04-01 |
1928.1067 |
Integrity Dig re: DENT |
2014-05-05 |
1928.4488 |
Integrity Dig re: DENT |
2014-06-03 |
1928.9975 |
Integrity Dig re: DENT |
2014-04-01 |
1928.9975 |
Integrity Dig re: DENT |
2014-05-05 |
1929.7954 |
Integrity Dig re: DENT |
2014-05-01 |
Mile Post 1930-1935

1930.7835 |
Excavate and install a protective barrier between the pipeline and the bottom of a creek or drainage ditch. A recent depth of cover survey identified need for additional protection at this site. Added cover will protect pipeline from erosion and contact with equipment. |
2010-07-07 |
1931.6797 |
Integrity Dig re: DENT |
2014-05-02 |
1931.7271 |
Integrity Dig re: DENT |
2014-06-02 |
1931.8390 |
Integrity Dig re: CORROSION |
2014-05-13 |
1933.5509 |
Integrity Dig re: DENT |
2014-06-06 |
1933.6461 |
Integrity Dig re: DENT |
2013-01-31 |
1933.6482 |
Integrity Dig re: CRACK |
2014-06-05 |
1933.9636 |
Integrity Dig re: DENT |
2014-04-03 |
Mile Post 1935-1940

1936.8100 |
As a result of major grading required for proposed West Link highway connector and transit corridor, a new section of pipe needs to be installed beneath the proposed highway connector and transit corridor at lower elevation, and be tied-in to exising Line 9 (400m of 30″ pipe to be installed). |
2011-08-11 |
1937.8858 |
Integrity Dig re: CRACK |
2014-06-02 |
1938.0266 |
Integrity Dig re: CORROSION |
2014-04-08 |
Like this: