Full Section (Mile Post 2060-2100)
2060.3569 | Integrity Dig re: DENT | 2007-12-17 |
2060.4302 | Integrity Dig re: DENT | 2013-08-30 |
2060.4522 | Integrity Dig re: CRACK | 2013-12-18 |
2062.5352 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2062.6949 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2063.0300 | Integrity Dig re: DENT | 2014-05-21 |
2064.3942 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
Mile Post 2065-2070
2065.0806 | Integrity Dig re: DENT | 2014-04-08 |
2065.5989 | Integrity Dig re: DENT | 2007-07-16 |
2066.1041 | Integrity Dig re: DENT | 2013-11-12 |
2068.5067 | Integrity Dig re: CORROSION | 2013-06-14 |
Mile Post 2070-2075
2070.7400 | Mitigating erosion issues on west side of the Rideau Canal | 2005-10-20 |
2071.0293 | Integrity Dig re: CRACK | 2014-05-05 |
2071.1822 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2071.3782 | Integrity Dig re: CRACK | 2014-04-17 |
2071.5763 | Integrity Dig re: CRACK | 2014-03-28 |
2071.5912 | Integrity Dig re: CRACK | 2014-03-28 |
2073.6346 | Integrity Dig re: CRACK | 2014-04-23 |
2073.9251 | Integrity Dig re: Not Specified | 2014-04-01 |
2073.9401 | Integrity Dig re: CRACK | 2014-05-27 |
2073.9550 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2074.0752 | Integrity Dig re: CRACK | 2014-03-21 |
Mile Post 2075-2080
2075.9102 | Integrity Dig re: CRACK | 2014-04-07 |
2075.9102 | Integrity Dig re: CRACK | 2014-05-02 |
2076.7618 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2076.8156 | Integrity Dig re: CRACK | 2014-04-07 |
2076.8232 | Integrity Dig re: CRACK | 2014-04-07 |
2076.8232 | Integrity Dig re: CRACK | 2014-04-28 |
2076.8307 | Integrity Dig re: CRACK | 2014-04-28 |
2076.8496 | Integrity Dig re: CRACK | 2014-04-28 |
2077.1908 | Integrity Dig re: CRACK | 2014-05-23 |
2077.3833 | Integrity Dig re: CRACK | 2014-04-24 |
2077.3898 | Integrity Dig re: CRACK | 2014-04-24 |
2077.9143 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2078.0876 | Integrity Dig re: CRACK | 2013-12-13 |
2079.0661 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2079.0680 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2079.2800 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2079.3218 | Integrity Dig re: CRACK | 2009-01-13 |
2079.6446 | Integrity Dig re: CRACK | 2014-05-23 |
2079.6522 | Integrity Dig re: CRACK | 2014-05-01 |
2079.7568 | Integrity Dig re: CRACK | 2014-04-23 |
2079.7643 | Integrity Dig re: CRACK | 2014-05-06 |
Mile Post 2080-2085
2081.2411 | Integrity Dig re: DENT | 2013-07-18 |
2082.7378 | Integrity Dig re: CRACK | 2014-05-29 |
2083.4937 | Integrity Dig re: CRACK | 2014-05-02 |
2083.8262 | Integrity Dig re: CRACK | 2008-08-26 |
2083.8713 | Integrity Dig re: CRACK | 2009-06-19 |
2084.4201 | Integrity Dig re: CORROSION. In addition, a culvert will be installed. | 2012-05-30 |
Mile Post 2085-2090
2085.2454 | Integrity Dig re: CRACK | 2014-05-27 |
2085.5626 | Integrity Dig re: CRACK | 2014-05-27 |
2085.6015 | Integrity Dig re: CRACK | 2014-05-21 |
2085.6090 | Integrity Dig re: CRACK | 2014-05-21 |
2085.7368 | Integrity Dig re: CRACK | 2014-05-09 |
2085.9603 | Integrity Dig re: CRACK | 2013-07-15 |
2086.2164 | Integrity Dig re: CRACK | 2009-01-13 |
2086.2302 | Integrity Dig re: CRACK | 2014-04-28 |
2086.2755 | Integrity Dig re: CRACK | 2014-04-28 |
2086.2831 | Integrity Dig re: CRACK | 2014-04-28 |
2086.2906 | Integrity Dig re: CRACK | 2014-04-28 |
2086.3206 | Integrity Dig re: CRACK | 2013-10-07 |
2086.4072 | Integrity Dig re: CRACK | 2014-04-28 |
2086.5489 | Integrity Dig re: CRACK | 2013-12-18 |
2086.5681 | Integrity Dig re: CRACK | 2014-05-09 |
2086.9339 | Integrity Dig re: CRACK | 2014-05-09 |
2086.9414 | Integrity Dig re: CRACK | 2014-05-09 |
2086.9860 | Integrity Dig re: CRACK | 2014-05-09 |
2087.8040 | Integrity Dig re: CRACK | 2014-06-19 |
2088.1676 | Integrity Dig re: CRACK | 2014-05-13 |
2088.1813 | Integrity Dig re: CRACK | 2013-07-15 |
2088.1889 | Integrity Dig re: CRACK | 2014-04-28 |
2088.2445 | Integrity Dig re: CRACK | 2014-04-28 |
2088.2820 | Integrity Dig re: CRACK | 2014-04-28 |
2088.3348 | Integrity Dig re: CRACK | 2014-04-28 |
2088.3573 | Integrity Dig re: CRACK | 2014-05-13 |
2088.3647 | Integrity Dig re: CRACK | 2014-04-28 |
2088.6066 | Integrity Dig re: CRACK | 2014-05-05 |
2089.5752 | Integrity Dig re: CRACK | 2014-04-03 |
2089.9113 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2089.9220 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
Mile Post 2090-2095
2090.5685 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2092.1747 | Excavate and install a protective barrier between pipeline and bottom of creek or ditch. Integrity protection of pipeline from contact by equipment or erosion. | 2010-06-29 |
2092.6194 | Integrity Dig re: CRACK | 2013-08-15 |
2092.6265 | Integrity Dig re: CRACK | 2013-07-08 |
2093.5047 | Integrity Dig re: DENT | 2013-10-23 |
Mile Post 2095-2100
2095.5267 | Integrity Dig re: DENT | 2013-07-31 |
2095.7053 | Integrity Dig re: CRACK | 2011-05-30 |
2095.7528 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2095.9200 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
2098.8643 | Integrity Dig re: CRACK | 2014-05-01 |
2099.7432 | Integrity Dig re: CRACK | 2013-06-14 |