Mirabel to Montreal – 2220-2260

Full Section (Mile Post 2220-2260)

Mirabel to Montreal - 2220-2260

Mile Post 2220-22252220-2225

2221.1778 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2221.2115 Integrity Dig re: CRACK 2013-06-24
2221.2190 Integrity Dig re: CRACK 2013-06-24
2221.8097 Depth of Cover Issue – Concrete slab installed 2009-09-16
2221.9233 Integrity Dig re: CRACK 2013-06-19
2221.9344 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2222.0384 Integrity Dig re: CRACK 2013-06-11
2222.3460 Depth of Cover Issue – Concrete slab installed 2009-09-16
2222.5186 Integrity Dig re: CRACK 2013-06-11
2222.5261 Integrity Dig re: CRACK 2013-06-11
2222.5498 Depth of Cover Issue – Concrete slab installed 2009-09-16
2222.6038 Depth of Cover Issue – Concrete slab installed 2009-09-16
2222.6743 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2222.7281 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2223.5685 Integrity Dig re: CRACK 2013-06-04
2224.8010 Depth of Cover Issue – Insufficient Cover 2009-09-16
2224.8618 Integrity Dig re: CRACK 2013-07-04

Mile Post 2225-2230

2225-2230

2225.0383 Integrity Dig re: CRACK 2013-07-04
2225.7766 Integrity Dig re: CRACK 2013-05-22
2225.7840 Integrity Dig re: CRACK 2013-05-29
2225.8997 Integrity Dig re: CRACK 2014-05-06
2225.9371 Integrity Dig re: CRACK 2014-05-06
2226.4545 Integrity Dig re: CRACK 2013-08-06
2227.9768 Depth of Cover Issue – Concrete slab installed 2009-09-16
2228.0377 Depth of Cover Issue – Concrete slab installed 2009-09-16
2228.1012 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2228.1620 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2228.3695 Depth of Cover Issue – Insufficient Cover 2009-09-16
2228.9593 Integrity Dig re: CRACK 2013-08-07
2229.1631 Integrity Dig re: CRACK 2014-04-08

Mile Post 2230-2235

2230-2235

2230.8377 Integrity Dig re: CRACK 2013-07-16
2230.9568 Integrity Dig re: CRACK 2013-07-16
2231.0341 Integrity Dig re: CRACK 2013-07-16
2231.0961 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2231.5838 Integrity Dig re: CRACK 2013-09-16
2231.6815 Integrity Dig re: CRACK 2013-09-16
2231.7559 Integrity Dig re: CRACK 2014-04-08
2232.2469 Depth of Cover Issue – Concrete slab installed 2009-09-16
2233.1218 Depth of Cover Issue – Concrete slab installed 2009-09-16
2233.1485 Depth of Cover Issue – Concrete slab installed 2009-09-16
2233.2467 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2233.2734 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2233.3719 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2233.5163 Depth of Cover Issue – Insufficient Cover 2009-09-16
2234.1942 Depth of Cover Issue – Insufficient Cover 2009-09-16

Mile Post 2235-2240

2235-2240

2235.0554 Integrity Dig re: DENT 2014-03-13
2235.3327 Integrity Dig re: CRACK 2013-08-12
2235.3475 Integrity Dig re: CRACK 2013-07-24
2235.4365 Integrity Dig re: CRACK 2013-08-09
2235.4589 Integrity Dig re: Not Specified 2013-09-06
2235.6781 Depth of Cover Issue – Concrete slab installed 2009-09-16
2235.8027 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2235.9367 Integrity Dig re: CRACK 2013-07-25
2235.9661 Integrity Dig re: CRACK 2013-07-23
2236.0114 Integrity Dig re: CRACK 2013-07-23
2236.0190 Integrity Dig re: CRACK 2013-07-23
2236.0266 Integrity Dig re: CRACK 2013-07-23
2236.2903 Integrity Dig re: CRACK 2013-08-13
2237.0364 Depth of Cover Issue – Concrete slab installed 2009-09-16
2237.1611 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2237.5017 Integrity Dig re: CRACK 2013-07-02
2237.5319 Integrity Dig re: CRACK 2013-07-02
2238.0483 Integrity Dig re: CRACK 2013-07-02
2238.1062 Integrity Dig re: CRACK 2013-07-15
2238.2169 Integrity Dig re: CRACK 2013-07-16
2239.4977 Integrity Dig re: CRACK 2013-07-03

Mile Post 2240-2245

2240-2245

2240.4452 Depth of Cover Issue – Concrete slab installed 2009-09-16
2240.5702 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2240.5726 Integrity Dig re: CRACK 2013-08-12
2241.6747 Integrity Dig re: CRACK 2013-05-22
2241.7033 Integrity Dig re: CRACK 2013-07-18
2241.7634 Integrity Dig re: CRACK 2013-07-16
2241.7784 Integrity Dig re: CRACK 2013-07-15
2242.7949 Integrity Dig re: CRACK 2013-07-08
2242.9002 Integrity Dig re: CRACK 2013-07-16
2243.0411 Integrity Dig re: CRACK 2013-07-08
2243.2884 Integrity Dig re: CRACK 2013-07-08
2243.2959 Integrity Dig re: CRACK 2013-06-12
2243.3462 Integrity Dig re: CRACK 2013-07-08
2243.4418 Integrity Dig re: CRACK 2013-07-15
2243.6007 Integrity Dig re: CRACK 2013-07-08
2243.6959 Integrity Dig re: CRACK 2013-07-08

Mile Post 2245-2250

2245-2250

2245.0770 Integrity Dig re: CRACK 2013-05-22
2245.4357 Integrity Dig re: CRACK 2013-06-12
2246.3321 Depth of Cover Issue – Concrete slab installed 2009-09-16
2246.4573 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2246.4970 Integrity Dig re: CRACK 2013-08-12
2246.9284 Integrity Dig re: CRACK 2013-06-14
2247.2592 Integrity Dig re: CRACK 2013-07-02
2249.7705 Tree Removal – 5 Trees within 10ft of Pipeline 2014-04-28

Mile Post 2250-2255

2250-2255

2250.1502 Tree Removal – 2 Trees within 10ft of Pipeline 2014-04-28
2250.1887 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2250.2877 Tree Removal – 6 Trees within 10ft of Pipeline 2014-04-28
2250.2900 Six trees to be removed within 10ft of pipeline 2013-09-27
2251.8427 Integrity Dig re: CRACK 2014-03-19
2251.8502 Integrity Dig re: CRACK 2014-03-19
2252.2022 Integrity Dig re: CORROSION 2010-10-26
2252.9729 Integrity Dig re: DENT 2014-03-25
2253.0480 Integrity Dig re: DENT 2014-01-31
2253.0846 Integrity Dig re: CRACK 2014-01-31
2253.0921 Integrity Dig re: CORROSION 2014-02-14
2253.1223 Integrity Dig re: CORROSION 2014-01-31
2253.1299 Integrity Dig re: CORROSION 2014-01-31
2253.3040 Integrity Dig re: CRACK 2013-07-16
2253.4208 Integrity Dig re: CRACK 2013-06-12
2253.8915 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2254.0034 Integrity Dig re: CORROSION 2014-02-19
2254.1221 Integrity Dig re: CORROSION 2014-02-14

Mile Point 2255-2260

2255-2260

2255.5968 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2255.6228 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2255.6617 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2256.0140 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2256.0160 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2256.8556 Tree Removal (within 10ft of pipeline) 2013-05-22
2257.1600 Tree Removal (within 10ft of pipeline) 2013-07-09
2257.6970 Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. 2010-07-07
2258.8758 Integrity Dig re: CORROSION 2010-10-26
2258.8758 Integrity Dig re: CORROSION 2010-11-03
2259.3892 Integrity Dig re: DENT 2013-06-10

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s