On March 6th, 2014, the NEB issued their decision on Enbridge Line 9.
The NEB ruled in favour of Line 9 IF all conditions were met.
Enbridge will still have to file for a Leave to Open (LTO) under Section 47 of the NEB Act.
Please Select an Item from the Drop Down Menu