Full Section (Mile Post 1980-2020)
| 1981.0449 | Integrity Dig re: CRACK | 2013-09-13 |
| 1981.7662 | Integrity Dig re: DENT | 2013-09-11 |
| 1981.7766 | Integrity Dig re: CRACK | 2013-09-11 |
| 1981.8220 | Integrity Dig re: DENT | 2014-04-29 |
| 1982.1176 | Integrity Dig re: CRACK | 2013-09-13 |
| 1982.1688 | Integrity Dig re: DENT | 2013-09-20 |
| 1982.1912 | Integrity Dig re: DENT | 2013-09-20 |
| 1982.2210 | Integrity Dig re: DENT | 2013-09-20 |
| 1982.2432 | Integrity Dig re: DENT | 2013-09-20 |
| 1982.2955 | Integrity Dig re: CRACK | 2013-09-20 |
| 1982.4752 | Integrity Dig re: DENT | 2014-05-21 |
| 1982.8034 | Integrity Dig re: CRACK | 2014-01-16 |
Mile Post 1985-1990
| 1985.0338 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
| 1986.7580 | Integrity Dig re: CRACK | 2014-03-03 |
| 1986.8316 | Integrity Dig re: CRACK | 2013-08-08 |
| 1988.4332 | Integrity Dig re: CRACK | 2013-08-13 |
| 1988.4410 | Integrity Dig re: CORROSION | 2012-05-18 |
| 1988.7653 | Integrity Dig re: CRACK | 2013-08-12 |
| 1988.9558 | Integrity Dig re: CORROSION | 2014-01-16 |
| 1989.8982 | Integrity Dig re: CRACK | 2013-08-20 |
Mile Post 1990-1995
| 1990.3704 | Integrity Dig re: CRACK | 2013-09-06 |
| 1990.4970 | Integrity Dig re: CRACK | 2013-08-20 |
| 1991.4157 | Integrity Dig re: CRACK | 2013-08-20 |
| 1991.4453 | Integrity Dig re: CRACK | 2014-05-13 |
| 1991.4843 | Integrity Dig re: CORROSION | 2008-11-06 |
| 1991.5011 | Integrity Dig re: CORROSION | 2008-11-06 |
| 1991.5019 | Integrity Dig re: CRACK | 2009-01-23 |
| 1991.5311 | Integrity Dig re: CORROSION | 2008-11-06 |
| 1991.5323 | Integrity Dig re: CORROSION | 2012-05-25 |
| 1992.0127 | Integrity Dig re: CRACK | 2014-06-06 |
| 1992.0328 | Integrity Dig re: CORROSION | 2008-11-06 |
| 1992.0608 | Integrity Dig re: CORROSION | 2008-11-06 |
| 1992.0616 | Integrity Dig re: CORROSION | 2012-05-31 |
| 1992.2468 | Integrity Dig re: CORROSION | 2012-07-25 |
| 1992.5441 | Integrity Dig re: DENT | 2014-02-24 |
| 1992.5441 | Integrity Dig re: DENT | 2014-02-24 |
| 1992.5729 | Integrity Dig re: DENT | 2014-02-24 |
| 1992.5729 | Integrity Dig re: DENT | 2014-02-24 |
| 1992.7637 | Integrity Dig re: DENT | 2014-04-24 |
| 1993.0805 | Integrity Dig re: CRACK | 2013-09-06 |
| 1993.1481 | Integrity Dig re: CRACK | 2013-09-06 |
| 1993.1783 | Integrity Dig re: CRACK | 2013-09-06 |
| 1993.2156 | Integrity Dig re: CRACK | 2013-09-06 |
| 1993.2232 | Integrity Dig re: CRACK | 2013-09-09 |
| 1993.2826 | Integrity Dig re: CRACK | 2013-09-06 |
| 1993.9065 | Integrity Dig re: CRACK | 2014-03-11 |
| 1994.8535 | Integrity Dig re: CRACK | 2013-09-13 |
Mile Post 1995-2000
| 1995.3041 | Integrity Dig re: CRACK | 2013-09-19 |
| 1995.5578 | Integrity Dig re: CRACK | 2013-09-19 |
| 1995.5953 | Integrity Dig re: CRACK | 2013-09-20 |
| 1995.8102 | Integrity Dig re: CRACK | 2013-09-19 |
| 1998.5275 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
| 1998.9707 | Integrity Dig re: CRACK | 2014-06-04 |
Mile Post 2000-2005
No Maintenance Activities
| 2007.8171 | Integrity Dig re: DENT | 2013-07-19 |
| 2008.1810 | Integrity Dig re: CRACK | 2014-05-23 |
| 2008.9545 | Integrity Dig re: CRACK | 2014-05-09 |
| 2008.9768 | Integrity Dig re: CRACK | 2014-05-09 |
Mile Post 2010-2015
| 2011.8551 | Integrity Dig re: CRACK | 2014-06-23 |
| 2014.8039 | Integrity Dig re: CORROSION | 2011-06-23 |
Mile Post 2015-2020
| 2015.2796 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
| 2015.3576 | Integrity Dig re: DENT | 2013-07-30 |
| 2015.5009 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
| 2016.0166 | Integrity Dig re: CORROSION | 2013-06-24 |
| 2017.0190 | Excavate and install a protective barrier between pipeline and bottom of creek or drainage ditch. Recent depth of cover survey identified insufficient cover at this site. | 2010-07-07 |
| 2018.4826 | Integrity Dig re: DENT | 2013-08-15 |